Re: It's going to be a LONG DAY!
Posted: 25 Aug 2012, 17:17
Well - to be honest, this job was a nightmare and I totally underestimated how long it would take with the cutting, weeding and pressing!
There was a logo on the front and the same logo on the rear together with the web address, phone number, email addresses and a lot of text to explain that events take place.
I made a quick calculation on the *weeding and the bits that were pulled out from this job (in about 7 hrs weeding off and on) - I pulled out 5015 bits!
for those that don't know:
*weeding is pulling/removing the bits of flex that are no longer required after a piece of flex has been cut (for example the centre or an A or the 2 middles of a B)
There was a logo on the front and the same logo on the rear together with the web address, phone number, email addresses and a lot of text to explain that events take place.
I made a quick calculation on the *weeding and the bits that were pulled out from this job (in about 7 hrs weeding off and on) - I pulled out 5015 bits!
for those that don't know:
*weeding is pulling/removing the bits of flex that are no longer required after a piece of flex has been cut (for example the centre or an A or the 2 middles of a B)